المصري اليوم
المصري اليوم
Ready to play
Ready to play
The article provides details about the commencement of the second phase of the BRT (Bus Rapid Transit) project around Greater Cairo. This phase extends from Ain Sukhna Road to the Sun Capital station, covering approximately 40 kilometers and including 16 stations. The cost of a short trip ranges from 5 to 10 Egyptian pounds, while the full journey between 27 and 30 stations costs about 35 pounds. The total length of the BRT system across both phases is approximately 75 kilometers. The project aims to improve the mass transit system, reduce traffic congestion, and provide air-conditioned, organized, electrically powered transportation. It also involves connecting stations with pedestrian facilities, overpasses, and tunnels, as well as establishing transfer points with other modes of transportation such as the metro and electric trains.
Notice: This Is an AI-Generated Summary
Comments (0)