المصري اليوم
المصري اليوم
Ready to play
Ready to play
The article discusses the risks and mistakes that can lead to the immediate removal of the pre-paid coded electricity meter, including tampering with connections or breaking seals, stopping energy supply for more than three months without proof, increasing load without notifying the company, refusing entry to inspectors, and transferring the meter without technical approval. It also points out that the issuance of decisions to demolish illegal buildings results in the removal of the meter. The article encourages correcting the status of the coded meter and converting it into a legal meter through official procedures and via the unified electricity services platform using official documents. It emphasizes that these measures are part of campaigns to prevent tampering and ensure compliance with legal connections. Additionally, it clarifies that a coded meter does not grant the owner ownership rights to the unit, and violating the terms may result in fines or contract cancellation.
Notice: This Is an AI-Generated Summary
Comments (0)