بوابة الشروق
بوابة الشروق
Ready to play
Ready to play
The National Authority for Railways has published new photos of the "Sidi Bashir" station project as part of Alexandria Metro line, which extends for 21.7 km from Abu Qir Railway Station to Misr Station. The project focuses on carrying out the construction works for the station structure and installing the tracks, aiming to improve the mass transit system in the city and serve thousands of citizens more efficiently. The line includes 20 stations, with increased capacity from 2,850 to 60,000 passengers per hour, a reduction in travel time from 50 to 25 minutes, an increase in operating speed from 25 to 100 km/h, and a decrease in headway from 10 to 2.5 minutes, with service exchanges with other railway and metro lines at key stations.
Notice: This Is an AI-Generated Summary
Comments (0)