المصري اليوم
المصري اليوم
Ready to play
Ready to play
The Ministry of Electricity and Renewable Energy has confirmed that the process of removing and replacing electric meters follows strict technical and regulatory standards. This includes all types of old and modern meters, whether mechanical or electronic. The replacement operations are part of a plan to modernize the grid, improve collection efficiency, and reduce technical and commercial losses, with the cost of replacing the meter borne by the subscriber and not the company. Subscribers are advised to pay the cost of the new meter and the applicable fees, as meters can become outdated due to environmental factors and loads. Technical committees monitor for faults or discrepancies in readings. A phased plan is also underway to transition to prepaid meters, with installment options available and online application submissions to ensure continuous supply and facilitate the process.
Notice: This Is an AI-Generated Summary
Comments (0)