Ready to play
Ready to play
The Egyptian Electricity Transmission Company signed a contract with Grid Solutions GE VERNOVE to rehabilitate the control and protection system at the Ben Suef Industrial Substation, operating at 500/220/66/22 kV. The contract, which extends over a period of eight months, aims to enhance the efficiency and performance of the SAS system functions, ensuring device integration and improved operational stability. This initiative supports industrial development and strengthens the reliability of the power transmission system in the region. It is part of the Ministry's efforts to develop the infrastructure to serve industrial projects and to improve the efficiency of the national electricity grid.
Notice: This Is an AI-Generated Summary
Comments (0)