10 Hrs
Source:
المصري اليوم
Source: المصري اليوم
10 Hrsالمصري اليوم
Source: المصري اليوم
10 HrsReady to play
Ready to play
Trial operations for the first phase of the Alexandria Metro are scheduled to begin in March 2027. The 21.7-kilometer line will run from Abu Qir in the east to Misr Station and will include 20 stations: six surface-level and 14 elevated.
Notice: This Is an AI-Generated Summary
Comments (0)