الوطن
الوطن
Ready to play
Ready to play
The Ministry of Local Development and Environment has extended the deadline for applying to settle building violations by six months. It also clarified seven cases and the associated costs: 1. If a licensed building has a violation involving a projection or light well, only the area of the violation is counted. 2. Deviations from the architectural and structural plans in a licensed unit require payment of 15% of the value of the violation. 3. Changes to room layouts that comply with the plans require payment of 5%. 4. The estimated fine is deducted from the settlement amount. 5. Paying the full amount in one installment entitles the applicant to a 25% discount. 6. A deviation from the structural plan alone, while complying with the architectural plan and the permitted number of floors, requires payment of 10%. 7. The settlement rate per square metre starts at 65 Egyptian pounds in villages and reaches a maximum of 2,500 pounds in some urban areas.
Notice: This Is an AI-Generated Summary
Comments (0)