الوطن
الوطن
Ready to play
Ready to play
The National Authority for Tunnels is implementing a plan to ease overcrowding and upgrade Metro Lines 1 and 2. The work includes modernizing signaling, communications and central control systems, as well as track and electrical infrastructure. The upgrade to Line 1 aims to reduce train intervals from 4.5 minutes to two minutes. It includes the delivery of 55 air-conditioned trains, four of which have arrived, and the refurbishment of 23 trains. Line 2 is targeted to reach a 2.5-minute interval, following the arrival of its first refurbished train in May 2026. The plan also includes localizing train manufacturing in Egypt, improving operational efficiency and safety, and reducing maintenance costs.
Notice: This Is an AI-Generated Summary
Comments (0)