بوابة الفجر
Source: بوابة الفجر
13 Hrsبوابة الفجر
Source: بوابة الفجر
13 HrsReady to play
Ready to play
Transport Minister Kamel El-Wazir and Alexandria Governor Ayman Attia inspected the Alexandria Metro projects, the redevelopment of the Raml Tram, and the Alexandria and Borg El Arab Stadium stations on the first line of the high-speed electric rail network. They called for accelerating work and adhering to the project schedules and quality and safety standards. The first phase of the metro will extend 21.7 kilometers and include 20 stations. It is expected to increase capacity from 2,850 to 60,000 passengers per hour in each direction and cut journey time from 50 to 25 minutes. The Raml Tram will extend 13.2 kilometers and include 24 stations, with capacity rising from 4,700 to 13,800 passengers per hour in each direction. The minister said that integrating these projects with the railways and other modes of transport would improve mobility, ease congestion, and strengthen connections between Alexandria and new cities, industrial areas, and tourist destinations.
Notice: This Is an AI-Generated Summary
Comments (0)