بوابة الفجر
Source: بوابة الفجر
1 Dayبوابة الفجر
Source: بوابة الفجر
1 DayReady to play
Ready to play
Housing Minister Randa El-Menshawy followed up on development, utilities and services projects in New Fayoum City, directing that work be accelerated and obstacles removed. The full route of the 6-kilometer road linking the city to Fayoum was handed over to the contractor. The road is scheduled for completion within a year and is expected to cut travel time between the two cities from 40 minutes to around 10. Work also included energizing the electrical network in the 180-feddan area, which has 10 compact substations and 38 low-voltage panels, and beginning construction of a sewage lift station in the second industrial zone and a 4.2-kilometer force main. The city also plans to build 12 kilometers of water networks, 8 kilometers of sewer networks and 12 kilometers of roads in the industrial zone, while continuing cleanup efforts and cracking down on encroachments and violations.
Notice: This Is an AI-Generated Summary
Comments (0)