بوابة الشروق
Source: بوابة الشروق
1 Dayبوابة الشروق
Source: بوابة الشروق
1 DayReady to play
Ready to play
Several people injured in the Ayat train collision told the Public Prosecution that train No. 134 had been travelling at speed from the moment it left Ayat station and continued at that speed until the collision. Investigations revealed that the controller and stationmaster at Al-Riqqa station had failed to monitor the signal panel, and that the controller had tampered with the signal logbook to conceal his negligence. Tests also showed that the train driver had disabled the automatic control system. The Public Prosecution ordered the controller and stationmaster held in pretrial detention, while the Attorney General formed a technical committee to inspect the railway system and determine the causes of the accident and who was responsible.
Notice: This Is an AI-Generated Summary
Comments (0)