بوابة الفجر
Source: بوابة الفجر
10 Hrsبوابة الفجر
Source: بوابة الفجر
10 HrsReady to play
Ready to play
Qalyubia Governor Hossam Abdel Fattah ordered a study of urgent measures to ease congestion at the Kafr Shibin level crossing, following a technical inspection to identify the causes of the bottleneck and improve traffic flow. Proposals include installing barriers along a 200-meter stretch, with 100 meters in each direction, and reorganizing traffic entering and leaving the villages of Kafr Shibin and Zawyet El Sheikh Sind using spiked speed bumps and barriers. The committee also proposed installing barriers along a stretch of about 120 meters in front of Beit El Seha Hospital. The impact of the proposed measures will be assessed during a one-week trial before they are adopted.
Notice: This Is an AI-Generated Summary
Comments (0)