1 Day
Source:
المصري اليوم
Source: المصري اليوم
1 Dayالمصري اليوم
Source: المصري اليوم
1 DayReady to play
Ready to play
Trial operations on the first phase of the Alexandria Metro are scheduled to begin in April or May 2027, following a revision to the previous timetable. The 21.7-kilometer line runs between Abu Qir and Misr Station and has 20 stations, in order: Abu Qir, Tosson, El-Maamoura, El-Eslah, El-Montaza, El-Mandara, El-Asafra, Miami, Sidi Bishr, Mohamed Naguib, Victoria, Ghobrial, El-Souk, El-Zaheriyah, Kafr Abdo, Sidi Gaber, Sporting, El-Hadra, Bab Sharq, and Misr Station. The project aims to reduce travel time between the two ends of the line from 50 minutes to 25 minutes and raise capacity to 60,000 passengers per hour in each direction.
Notice: This Is an AI-Generated Summary
Comments (0)