6 Hrs
Source:
بوابة الشروق
Source: بوابة الشروق
6 Hrsبوابة الشروق
Source: بوابة الشروق
6 HrsReady to play
Ready to play
Road and Transport Engineering Professor Hassan Mahdi said that removing rail fasteners could constitute an act of sabotage, after a wheel on the fourth car of the “Tahya Misr” train left the track on the Ismailia–Suez line between Nefisha and al-Dhabia. The Railway Authority said the theft of eight metal fasteners caused the accident, which occurred Thursday afternoon without causing injuries or disrupting operations. Mahdi said other technical factors can also cause trains to derail, including track subsidence, an incorrect distance between the rails, poor maintenance, and exceeding the speed limit at switches.
Notice: This Is an AI-Generated Summary
Comments (0)