14 Hrs
Source:
مصراوي
مصراوي
Ready to play
Ready to play
Transport Minister Kamel al-Wazir directed railway engineering teams to inspect all lines across the governorates and ensure the rails and their fastening and securing equipment are safe, after a carriage on the Ismailia–Suez train derailed. The Egyptian National Railways Authority attributed the incident to the theft of eight rail clips. No passenger injuries were reported. The minister ordered train services on the line suspended until it had been fully inspected and the necessary security measures taken.
Notice: This Is an AI-Generated Summary
Comments (0)