24 Hrs
Source:
بوابة الفجر
بوابة الفجر
Ready to play
Ready to play
The Civil Protection Forces in Qalyubia succeeded in controlling a fire inside a factory under finishing works in the Obour area, without any injuries or fatalities. The fire broke out in a refrigerator covering approximately 100 square meters while workers were present. The flames were contained and prevented from spreading, while cooling operations continued to ensure they did not reignite. A report was filed, and the prosecution was notified to investigate the incident.
Notice: This Is an AI-Generated Summary
Comments (0)