Ready to play
Ready to play
The Governor of Menoufia is monitoring the planting of demonstration fields and summer crops. Additionally, the Menoufia Drinking Water Company has announced a plan to cut water supplies for network flushing in June 2026. The maximum state of preparedness has been raised to welcome Eid al-Adha, along with field supervision to repair a soil subsidence in Shebin El Kom city, and full power operations during examination periods.
Notice: This Is an AI-Generated Summary
Comments (0)