Ready to play
Ready to play
A source at the Ministry of Electricity revealed that the increase in the cost of installation estimates for meters in new buildings is due to higher prices for electrical supplies, such as cables and transformers, resulting from the rising costs of imports and global manufacturing raw materials. The estimate amounts vary between regions depending on the location's nature and the level of development, with a standardized estimation system applied that determines prices based on the area's classification. Additionally, the actual estimation depends on real costs after a technical inspection. The update aims to fund expansion projects and improve power quality, conditioned on the availability of official documents from the applicant before installing the meters.
Notice: This Is an AI-Generated Summary
Comments (0)