Ready to play
Ready to play
The water leakage repair work underneath the Nile Bridge tunnel in Minya Governorate has been ongoing. Equipment was used to pump out the water, and drilling was carried out to reach the source of the leak. Additionally, water samples were collected for analysis to determine the cause of the leak, with the aim of resolving the issue, preventing its recurrence, and improving traffic flow.
Notice: This Is an AI-Generated Summary
Comments (0)