الموجز
الموجز
Ready to play
Ready to play
The Egyptian Minister of Electricity and Renewable Energy discussed with Saudi Arabia's Acwa Power enhancing cooperation in the implementation of wind projects with a total capacity of up to 2,300 megawatts. This includes two projects with capacities of 1,100 MW and 1,200 MW, which are expected to be connected to the grid before 2027 and 2029, respectively. During the meeting, the progress of work was monitored, and a commitment to adhere to the scheduled timelines was reaffirmed, with an emphasis on accelerating implementation and connecting the projects to the national grid ahead of schedule, as part of the state's strategy to increase the share of clean energy to 45% by 2028.
Notice: This Is an AI-Generated Summary
Comments (0)