1 Day
Source:
المصري اليوم
المصري اليوم
Ready to play
Ready to play
The rise in temperatures caused a section of the overhead network at the Masara station on Line 1 of the metro to fall, resulting in a minor malfunction that lasted less than 15 minutes. Immediately, maintenance teams intervened to repair the issue and restore normal operations, with train movement continuing without delay and without significant impact.
Notice: This Is an AI-Generated Summary
Comments (0)