صدى البلد
صدى البلد
Ready to play
Ready to play
Transport Minister Kamel Al-Wazir conducted an inspection tour of the work sites on the second line of the high-speed electric train network, which extends from October to Aswan and spans 1,100 km. The project aims to enhance connectivity between cities, industrial areas, and tourist regions across Egypt. The minister inspected 36 stations along the route, including 13 for high-speed trains and 23 for regional trains, with the goal of improving passenger movement, facilitating transportation between governorates, and supporting economic development. This is to be achieved while adhering to quality standards and executing the work with precise measurements. The line will contribute to reducing travel times, creating job opportunities, and strengthening links between tourist and industrial production zones. Additionally, it supports the development of new areas, logistics zones, and industrial regions in Upper Egypt.
Notice: This Is an AI-Generated Summary
Comments (0)