9 Hrs
Source:
The Guardian
The Guardian
Ready to play
Ready to play
The company contracted to renovate the Lincoln Memorial reflecting pool admitted that flaws in their repair plan and human oversight caused the liner to peel and tear, contradicting Donald Trump’s claims that vandalism was responsible. The $14.7 million no-bid contract was awarded to Atlantic Industrial Coatings, which blamed its own execution and design issues for the damage, which occurred during an accelerated schedule before the 250th anniversary celebrations. Despite acknowledging errors, Trump continued to assert vandalism and claimed that damage was minimal.
Notice: This Is an AI-Generated Summary
Comments (0)