وكالة بغداد اليوم الاخبارية
وكالة بغداد اليوم الاخبارية
Ready to play
Ready to play
The Diyala Province has begun implementing the "Guated Dam" project on the Diyala River with the aim of regulating water flow, addressing low water levels and drought, and maximizing the benefit from available water resources. The project will support more than 30,000 donums of agricultural land, in addition to boosting tourism and enhancing water management flexibility during periods of drought and floods. Construction sites have been selected based on geographical conditions to ensure the drainage of large volumes of water without flooding neighboring areas. This initiative is part of efforts to improve water resource management affected by climate change and infrastructural weaknesses.
Notice: This Is an AI-Generated Summary
Comments (0)