17 Hrs
Source:
وكالة بغداد اليوم الاخبارية
وكالة بغداد اليوم الاخبارية
Ready to play
Ready to play
The Baghdad Operations Command carried out a campaign to remove violations from rivers and irrigation projects in the northern areas of the capital. This included filling and breaking the banks of 11 unauthorized fish ponds and removing violations on rivers and irrigation projects in the Tarmiyah district. These measures aim to preserve the water allocations designated for irrigation, reduce waste, and are part of ongoing efforts to support government agencies through a joint operation with the Water Resources Department.
Notice: This Is an AI-Generated Summary
Comments (0)