20 Hrs
Source:
وكالة الانباء العراقية (واع)
وكالة الانباء العراقية (واع)
Ready to play
Ready to play
The Iraqi Ministry of Water Resources has removed 36,000 cubic meters of sediments from the Basra Water Project, in accordance with the directives of Minister Mithna Al-Tamimi, aimed at improving water supply in the region.
Notice: This Is an AI-Generated Summary
Comments (0)