2 Hrs
Source:
المدى
المدى
Ready to play
Ready to play
Transport Minister Wahab al-Hasani opened the immersed tunnel in the Khor al-Zubair Canal in Basra Governorate on Thursday. The tunnel links the Grand Faw Port with Umm Qasr Port as part of the logistical network for the Development Road project. The Ministry of Transport described it as an engineering achievement and a vital artery that will reduce travel distances and time.
Notice: This Is an AI-Generated Summary
Comments (0)