17 Hrs
Source:
وكالة موازين نيوز
Source: وكالة موازين نيوز
17 Hrsوكالة موازين نيوز
Source: وكالة موازين نيوز
17 HrsReady to play
Ready to play
Infrastructure development work has resumed in the Al-Hawshi area of Imam al-Sadiq District in Basra, on the instructions of Prime Minister Ali Falih al-Zaidi, after stalling when 40% of the project had been completed. The work includes paving with interlocking blocks, constructing a central channel, installing stormwater drainage networks, and carrying out grading. The pace of work is expected to pick up once funding is made available. Technical plans have also been prepared to develop nine other areas, but work on those projects depends on allocating the necessary funds.
Notice: This Is an AI-Generated Summary
Comments (0)