Ready to play
Ready to play
The Diyala Electricity Distribution Directorate announced the resumption of the two electricity interconnection lines with the Kurdistan Region (Kalar 1 and Kalar 2) at a voltage of 132 kilovolts. Additionally, a new production capacity of approximately 120 megawatts has been added to improve the network's stability and voltage in the province.
Notice: This Is an AI-Generated Summary
Comments (0)