السوسنة
السوسنة
Ready to play
Ready to play
The Ministry of Public Works and Housing announces the completion of maintenance work on the Irbid-Ghor (Salam Street) route starting Saturday. This is part of a comprehensive plan to repair and improve this vital road in the North Governorate. The works include removing old asphalt mixes, applying improved materials with polymer additives, and implementing traffic safety measures such as road painting, installing reflectors, and signage. Additionally, maintenance will be carried out on the Northern Shuna Bridge, including replacing expansion joints and repairing barriers. Temporary traffic diversions will be implemented in cooperation with Public Security to ensure smooth traffic flow. Drivers are urged to adhere to signals and instructions to maintain safety. The work will continue until full restoration is completed, aiming to enhance the efficiency of the road and the safety of its users.
Notice: This Is an AI-Generated Summary
Comments (0)