الدستور
Advertisement
Advertisement
Source: الدستور
52 DaysAdvertisement
الدستور
Advertisement
Advertisement
Source: الدستور
52 DaysAdvertisement
Ready to play
Ready to play
The Greater Amman Municipality has implemented strategic projects to enhance and improve infrastructure, particularly the stormwater drainage network, with the aim of reducing water pooling and increasing the area's readiness during the rainy season. The projects included the construction of two box culverts in Princess Tharwat Street at a cost of one million dinars, as well as culverts in the areas of Khreibet Al-Souq and Marj Al-Hamam at a total cost of up to three million dinars. Additionally, culverts were built on Bay'at Al-Radwan and Muhammad Diya Al-Haq Streets, each stretching 1500 meters, at a cost of one and a half million dinars. These projects contribute to modernizing the stormwater drainage system, enhancing road safety, and improving the level of services provided to citizens.
Notice: This Is an AI-Generated Summary
Comments (0)