وكالة الانباء الاردنية
وكالة الانباء الاردنية
Ready to play
Ready to play
The Greater Irbid Municipality has announced the start of comprehensive maintenance work on Omar Al-Mukhtar Street (Thirty Street). This includes removing asphalt layers and repaving the lanes from the intersection with King Hussein Street in front of Al-Sharq Hall to its junction with Omar bin Abdul Aziz Street (Al-Rawda Square). The project will also involve installing stormwater drainage lines to address water accumulation, as well as rehabilitating the sidewalks to ensure ease and safety for pedestrians. The work is expected to take approximately three weeks, with partial and full closures and announced traffic detours integrated into the schedule. This maintenance follows extensive expansion on parts of the street to add lanes, aiming to improve traffic flow and pedestrian safety.
Notice: This Is an AI-Generated Summary
Comments (0)