الوكيل الإخباري
الوكيل الإخباري
Ready to play
Ready to play
The Ministry of Public Works and Housing announced that the Laboratory and Quality Control Department detected approximately 535 non-compliant samples out of the 2,289 samples tested in road and building projects during the year 2025, representing a rate of 23.4%. Regulatory measures are being taken to ensure the non-use of non-conforming materials, including documenting the results and refusing work associated with such materials until correction and calibration are achieved. Additionally, field visits and random sampling were conducted to monitor the quality of execution. The ministry is working on upgrading laboratories, especially for asphalt mixture testing, and developing electronic systems to increase accuracy and speed of reporting, all aimed at enhancing project quality, prolonging their lifespan, and reducing maintenance work.
Notice: This Is an AI-Generated Summary
Comments (0)