الوقائع الإخبارية
الوقائع الإخبارية
Ready to play
Ready to play
The Ministry of Public Works and Housing has begun implementing a strategic traffic plan at the Prince Hussein intersection to improve vehicle flow on Queen Alia Airport Road. The aim is to reduce recurring congestion and facilitate the movement of those coming from the Abdelrahman Corridor tunnel exit. The modifications include redesigning the site and separating the lanes into two directions: one for vehicles on Queen Alia Airport Road, and the other directly towards Al-Nakhil Suburb and Al-Sahaba District. The goal is to enhance the efficiency of the intersection, reduce waiting times, and improve safety standards and driver safety guidance during the implementation period.
Notice: This Is an AI-Generated Summary
Comments (0)