الوقائع الإخبارية
الوقائع الإخبارية
Ready to play
Ready to play
Amman Greater Municipality plans to implement a partial traffic plan in King Talal Tunnel at the Third Circle during the night, starting from Sunday evening. The goal is to update the lighting system and install modern lighting units using LED technology to enhance safety and security for drivers. The closure will take place from 11 PM to 6 AM in coordination with the Traffic Department to ensure smooth traffic flow, with adherence to traffic signs and detours to avoid congestion. These measures aim to improve traffic conditions and reduce risks caused by poor lighting. They are part of the strategy to develop the road network and upgrade smart systems in the capital.
Notice: This Is an AI-Generated Summary
Comments (0)