21 Hrs
Source:
الوكيل الإخباري
الوكيل الإخباري
Ready to play
Ready to play
The Jordanian Ministry of Water and Irrigation, in cooperation with the relevant authorities, seized violations on the 400 mm diameter transmission line that supplies drinking water to the Nabaa Al-Kursi station. This line is also used for filling collection and farm wells. The violations were removed, and the confiscated items were prepared for legal proceedings. Additionally, a non-compliant well was detected in the Hirwa area/Irbid, which was filled in, and the necessary documentation for the incident was prepared.
Notice: This Is an AI-Generated Summary
Comments (0)