1 Day
 السبيل
Source:

السبيل

2026-08-08T11:14:34.000Z

Most Read

Hawking on life and work

جو24جو24جو24
21 Hrs2026-08-08T18:06:37.000Z
Hawking on life and work

Jorge Messi's dedication to his son's health and his career success

جو24جو24جو24
21 Hrs2026-08-08T18:05:34.000Z
Jorge Messi's dedication to his son's health and his career success

Oman warns of shipping risks in Hormuz Strait talks

الوقائع الإخباريةالوقائع الإخباريةالوقائع الإخبارية
21 Hrs2026-08-08T17:54:00.000Z
Oman warns of shipping risks in Hormuz Strait talks

Al-Eisawi Sends Condolences to Clans

الوكيل الإخباريالوكيل الإخباريالوكيل الإخباري
21 Hrs2026-08-08T17:47:10.000Z
Al-Eisawi Sends Condolences to Clans

Over 148,000 families received aid in early 2023

الوكيل الإخباريالوكيل الإخباريالوكيل الإخباري
21 Hrs2026-08-08T17:38:42.000Z
Over 148,000 families received aid in early 2023
 السبيل

Source: السبيل

1 Day
Jarayid.com
Follow Us
Jarayid.com

Smart Reader

Ready to play

Smart Reader

Ready to play

Transport time impacts meal safety

Transport time impacts meal safety

The Directorate of Regional Affairs at the Food and Drug Authority emphasizes the importance of the transportation duration of food shipments in maintaining their safety, especially during the summer seasons and high temperatures. Since the beginning of the year, the authority has carried out over 40,000 field inspections focused on food establishments, coinciding with the summer season to address increased consumption of fast food and summer-related needs. The inspections include examinations of warehouses, health certificates for workers, and verification of the safety of materials and delivery conditions. There is also a warning about the necessity of shortening transportation times to prevent deterioration of food quality. In cases of violations, procedures vary from warnings to closures or referral to the prosecuting authorities, with an emphasis on maintaining proper temperature levels throughout the transportation process.

Size: 120%Text Size

Notice: This Is an AI-Generated Summary

Display The Full Article
Share the News

Comments (0)

JARAYID.COM

Jarayid is your destination for lifestyle and cultural news, combining quality journalism, modern trends, and thoughtfully curated content to inform, inspire, and connect readers globally.

Download App Free!

Scan the QR Code

QR code

Follow Us

OUR PICKS

Tech thumbnail
Tech

HyperOS 4 introduces 10 AI improvements

World News thumbnail
World News

British Maritime Authority reports vessel hit near Oman

Sports thumbnail
Sports

Barcelona Alters Alvarez Strategy

Categories

  • Podcast02
  • America409
  • Europe168
  • Health196
  • Shows91
  • Sports213
  • Tech260
  • World News439
  • Celebrity News95
  • Economy175
  • Terms & Conditions|
  • Privacy Policy|
  • About Us|
  • Contact Us|
  • Advertise With Us|
  • FAQ|
  • Archive

© 2026 Jarayid.com