22 Hrs
Source:
الوكيل الإخباري
الوكيل الإخباري
Ready to play
Ready to play
The maximum recorded electrical load in Jordan reached 4,020 MW, indicating that the power system is highly reliable, with improved measures in place to handle high demand. The National Electric Power Company emphasized the importance of reducing electricity consumption during peak hours to maintain the stability of the electrical grid.
Notice: This Is an AI-Generated Summary
Comments (0)