وكالة الانباء الاردنية
وكالة الانباء الاردنية
Ready to play
Ready to play
The Ministry of Public Works and Housing has completed repair works on the Moses Road, which connects the Moses Triangle to the tourist site and the Dead Sea shoreline, with the aim of improving safety and efficiency on the road. The work included stripping away the old asphalt layer, patching, and laying a new basalt mix layer over approximately 5 kilometers. Additionally, traffic safety elements were reinforced through re-designing lanes and installing reflectors, to facilitate movement and enhance safety for visitors and tourists, especially those traveling to the Moses Site and the Dead Sea area. These efforts are part of broader development initiatives for the site and surrounding region, aimed at boosting Jordan’s religious and tourism stature on the international level.
Notice: This Is an AI-Generated Summary
Comments (0)