السوسنة
السوسنة
Ready to play
Ready to play
The article explains that the increased water consumption during the summer, especially in the Tabarbour area, leads to delays in delivering water to some neighborhoods. Water Company received about 30 complaints and dispatched 170 trips to supply citizens with water, with delays ranging from 10 to 12 hours due to the surge in demand caused by rising temperatures and the lack of precise estimates of the number of people arriving in the kingdom during the summer. The company expects consumption to return to normal levels starting September, which will speed up regular supply. It emphasizes that the issue is related to the water situation, the limited challenges facing water resources, and the annual technical planning to address imbalances and update the networks.
Notice: This Is an AI-Generated Summary
Comments (0)