Ready to play
Ready to play
The Chairman of Greater Amman Municipality's Committee, Ahmed Al-Melkaawi, focused on strengthening and facilitating the completion of the box culvert project on Princess Tharwat Street, aimed at improving the stormwater drainage network in Wadi Sir. He emphasized the need to accelerate the project's work, which stretches over a one-kilometer length, as part of the Municipality's efforts to develop infrastructure and enhance safety during the winter season. The goal is to complete the project with the highest technical and engineering standards to reduce water pooling and hot spots during rainfall periods. The tour included a detailed explanation from engineering staff about the implementation stages. Through the execution of eight tenders totaling up to 10 million Jordanian dinars, the Municipality aims to improve stormwater drainage systems in various areas of the capital.
Notice: This Is an AI-Generated Summary
Comments (0)