سرايا الإخبارية
سرايا الإخبارية
Ready to play
Ready to play
The Greater Amman Municipality is implementing eight tenders to improve the rainwater drainage network in preparation for the upcoming rainy season. The projects include constructing new networks, as well as maintaining and rehabilitating the existing system in various areas of the capital, with the aim of addressing water pooling and enhancing readiness. The projects rely on evaluating the network's performance after each season and focus on areas prone to water accumulation, through technical studies and predictions of "hotspot" locations. These initiatives involve building box culverts and collection tanks with capacities of up to 3,000 cubic meters, in addition to infrastructure rehabilitation, with the goal of reducing rainwater accumulation and improving drainage performance in areas such as Wadi Al-Seer, Marj Al-Hamam, Bseman, and Tiba. These measures are part of an ongoing plan to upgrade infrastructure to better handle the rainy season.
Notice: This Is an AI-Generated Summary
Comments (0)