Ready to play
Ready to play
The Az Zarqa Governorate Works Directorate has completed general maintenance works aimed at improving rainwater drainage and protecting roads as part of projects valued at 134,000 Jordanian dinars, funded from the Governorate Council's budget. The work included replacing pipe culverts at three locations on the Bairn–Al-Khalla road with box culverts of varying sizes, and enhancing the entrances and exits of culverts at 16 sites along the Jerash–Az Zarqa and Bairn–Al-Khalla roads to strengthen protection against water flows and erosion. Additionally, a trench on the Jerash–Az Zarqa road at Doqra intersection was lined with "Rubarab" to improve rainwater drainage during the winter and reduce water pooling, thereby helping to maintain road safety and infrastructure integrity.
Notice: This Is an AI-Generated Summary
Comments (0)