Ready to play
Ready to play
The Ministry of Public Works and Housing began this morning maintenance and expansion work on a section of the Amman–Salt Road, from Dababa Bridge to Um Al-Nuwayj Bridge. The work includes widening the road and removing old asphalt mixtures, as well as applying a layer of improved basaltic asphalt mixture with polymer. Traffic safety standards are being enhanced through the painting of defects and the installation of ground reflectors. The project aims to update and maintain major roads in the Central Region to improve safety and traffic efficiency, with an interim traffic plan in place to ensure the smooth flow of traffic and protect both workers and users.
Notice: This Is an AI-Generated Summary
Comments (0)