الوكيل الإخباري
الوكيل الإخباري
Ready to play
Ready to play
The Ministry of Public Works and Housing has begun maintenance work on a section of King Abdullah Street in Al Salt city, extending from the Sixth Bridge towards the Shajarah Tunnel. This is part of a plan to repair and upgrade major roads in the Central Region. The works include stripping and removing damaged asphalt layers and replacing them with an improved polymer-modified mix. Traffic safety measures such as road markings and reflective tapes will also be applied. The goal of the plan is to enhance the efficiency of the road network and improve traffic safety, in coordination with the Public Security Directorate. Efforts will be made to maintain smooth traffic flow during the implementation, and drivers are urged to observe signals and precautions to ensure safety and the successful completion of the work within the scheduled timeline.
Notice: This Is an AI-Generated Summary
Comments (0)