17 Hrs
Source:
الوقائع الإخبارية
الوقائع الإخبارية
Ready to play
Ready to play
The Vahais Municipality announced that it is increasing field inspections by the Engineering Services teams as part of their early winter preparedness plan, aiming to improve infrastructure readiness to face weather conditions. The focus is on checking rainwater drainage systems, culverts, and flood channels, and addressing technical observations to ensure the continuous and effective provision of services to citizens during the rainy season. These measures are part of efforts to enhance municipal service efficiency and minimize the impact of weather conditions on the city.
Notice: This Is an AI-Generated Summary
Comments (0)