17 Hrs
Source:
الوكيل الإخباري
الوكيل الإخباري
Ready to play
Ready to play
The Amman Development Corridor Lighting Project has achieved approximately 75% progress, with all work expected to be completed within two weeks. The project utilizes smart solar-powered lighting systems with high-efficiency LED technology, covering a longitudinal distance of 42 kilometers. Its goals are to improve visibility and nighttime safety, reduce energy consumption and costs, and minimize the risks of theft and damage associated with traditional lighting. This initiative is part of green projects that promote the use of renewable energy and contribute to both financial savings and environmental benefits.
Notice: This Is an AI-Generated Summary
Comments (0)