11 Hrs
Source:
الدستور
الدستور
Ready to play
Ready to play
The Ministry of Public Works and Housing completed a 150-meter temporary alternative road on the Al-Rama–Al-Joufa route in less than three days, after the main road was closed due to cracks near the bridge, to maintain local traffic. The road has six pipe culverts, and trucks are prohibited from using it. It will also be temporarily closed when water flows over it, in coordination with Public Security. The ministry said it would begin building a new box culvert to replace the old bridge.
Notice: This Is an AI-Generated Summary
Comments (0)