4 Hrs
Source:
وكالة عمون الاخبارية
Source: وكالة عمون الاخبارية
4 Hrsوكالة عمون الاخبارية
Source: وكالة عمون الاخبارية
4 HrsReady to play
Ready to play
Hani Al-Marashdeh, Director of the Construction Department at the Greater Amman Municipality, said no new hotspots for rainwater accumulation had been identified in the capital. He noted that field teams had dealt with runoff and limited pooling caused by heavy rainfall. He explained that projects to upgrade drainage networks and build culverts are under way at previously identified locations, and that water generally recedes within about ten minutes after the rain stops or eases. The municipality continues to monitor these sites and assess the solutions needed to address any future pooling.
Notice: This Is an AI-Generated Summary
Comments (0)