1 Hr
Source:
الوقائع الإخبارية
Source: الوقائع الإخبارية
1 Hrالوقائع الإخبارية
Source: الوقائع الإخبارية
1 HrReady to play
Ready to play
The Greater Amman Municipality confirmed that its field teams are ready to deal with rainwater pooling and limited flash flooding. It noted that no new hotspots have been identified and that ongoing projects are focused on sites identified previously. Hani Al-Marashehdeh, Director of the Construction Department, explained that heavy rainfall and sloping terrain can delay drainage, but in most locations the water recedes within about ten minutes after the rain stops or eases. The municipality continues to monitor these sites, upgrade drainage networks, and build box and pipe culverts to reduce water pooling in the future.
Notice: This Is an AI-Generated Summary
Comments (0)